GRE Tunnel with Two or more Branches

gre-challenge-4

Task 1 > Configure devices’ name and IP setting of all routers and Switch (ISP Switch).

Task 2 > Configure to get routers’ public IP addresses connectivity each other.

Task 3 > Create Tunnel 1 between R1 and R2. If successful, tunnel is Up and should reach     each other tunnel IP.

Task 4 > Create Tunnel 2 between R1 and R3. If successful, tunnel is Up and should reach   each other tunnel IP.

Task 5 > Router should get connection each other private LAN networks. In this case, only static routing is allowed to configure.

Task 6 > To use routing protocols instead of Static, delete static route entries and make     sure no static route exist in routers.

Task 7 > Set up Dynamic Routing protocol EIGRP for LAN connections of Routers.

You finished your Lab.

Download Lab Solution
Password: ip6ccnalab



My Photo1About author
Nyi Nyi Min
, CCNP, CCDP, is a Instructor and Course
Developer on CCNA, CCNP, CCIE. He holds multiple
professional certifications from Cisco Juniper,
Microsoft, VMware, etc.. and worked and supported
several enterprise networks. He is Founder of
IP6 Networks (www.ip6networks.com), where he currently teaches
CCNA, CCNP Classes.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s